Thames Water finally start work at Woolwich leak after nearly a month

Work to repair a leaking water pipe in Woolwich town centre has begun today after nearly a month of waiting.

Thames Water have closed one side of  Woolwich New Road beside Tesco.

Road closed beside Tesco where flammable cladding being replaced (but sadly the same dreary colour scheme seems to remain)

Work is expected to take five days to complete.

Thames Water blamed delays on fixing the issue due to pressures with other leaks and nearby work to remove flammable cladding.

------------------

Running a site takes time and costs money.

You can support me via Paypal with a one-off or monthly donation here

Another option is via Patreon by clicking here

You can also buy me a beer/coffee at Ko-fi here

Many thanks

There's also a Facebook page for the site here

J Smith

I've lived in south east London most of my life growing up in Greenwich borough and working in the area for many years. The site has contributors on occasion and we cover many different topics. Living and working in the area offers an insight into what is happening locally.

    Leave a Reply

    Your email address will not be published. Required fields are marked *

    This site uses Akismet to reduce spam. Learn how your comment data is processed.